Gold Coast Solar Specialists

Gold Coast Solar & Battery Specialists

If your Gold Coast power bill is hitting $1,000–$1,200 a quarter — pool, ducted AC, the works — that number is heading one direction on the Energex network. A solar-and-battery system sized to your actual usage brings most Gold Coast homes to 0–5% grid use from month one.

No PressureNo Obligation100% Free5.0 · 22 Google Reviews

What $1,200 a Quarter Actually Costs Gold Coast Homeowners

$4,800
Per year to Energex
$0–$200
SEG customers average

That's $4,600+ back in your pocket every year — on a system sized to YOUR Gold Coast home.

SAA Contractor Licence S0429773
Energex network — full connection managed
Complete rebate paperwork — $5,900–$16,200+
$0 upfront available for qualified homeowners
Why Act Now

Why Gold Coast Solar Just Got More Important

From 1 July 2026, retailers across South East Queensland must offer three hours of free midday electricity through the Solar Sharer Offer. That sounds like good news. In practice it confirms what Gold Coast solar owners already suspect: daytime exports are worth nothing to the grid.

The homeowners winning from 2026 are the ones storing their solar for evening use instead of exporting it. That's how a Gold Coast home — pool, ducted AC, $1,200 quarterly bill — gets to near-zero. The Energex network covers all of SEQ, and the opportunity is the same for every Gold Coast household. So is the exposure for those who don't act.

Service Area

Our Gold Coast Service Area

We install and service solar and battery systems across the Gold Coast — from Coomera in the north to Tweed Heads South in the south.

Map showing Gold Coast, Queensland
Licensed & Accredited

Our Queensland Credentials

S0429773
SAA Contractor Licence
Queensland
ECL 89770
Electrical Contractor Licence
Queensland
25 Yrs
Partnership Commitment
Not just an install
ABN
66 692 934 035
Registered Australian Business
Local Network

Energex & South East Queensland Tariffs

Gold Coast homes connect to the Energex distribution network, covering all of South East Queensland. Time of Use (TOU) tariff options mean the time of day you draw from the grid affects your per-unit cost. A correctly sized solar-and-battery system maximises self-consumption during peak generation hours and stores energy for expensive evening peak periods — reducing the grid draw that costs you most.

Coverage

Suburbs We Service in Gold Coast

Our team services all Gold Coast suburbs. A sample of areas we cover:

What Our Customers Say

“Before signing with Source Energy Group, I sought quotes from several other solar companies. My experience with Source Energy Group was the complete opposite — they quickly presented practical solutions to every challenge. Source Energy Group delivered a high-quality solar system with professionalism, integrity, and care at a fair price.”

Brian Hansen · Sunshine Coast · Solar + Battery

Read all 22 Google reviews →
FAQs

Gold Coast Solar Questions Answered

For a Gold Coast home with a pool, ducted AC, and a $1,000–$1,200 quarterly bill, a correctly sized solar and battery system typically brings the bill to $0–$200 per quarter. Most SEG customers hit under 5% grid use within the first month. The key is sizing the system to your actual evening load — not a generic 6.6kW package designed for a $400 bill.
Yes — the Gold Coast receives an average of 5.5 peak sun hours per day, making it one of Australia's best locations for solar generation. South-facing or north-facing roofs at typical Queensland pitch angles produce strong year-round output. Most Gold Coast homes can cover a significant share of daytime load from solar alone, with a battery extending coverage into evening peak hours.
Queensland homeowners are eligible for STCs (Small-scale Technology Certificates) under the federal scheme — typically $3,500–$10,000 depending on system size. The Queensland Home Battery Scheme (CHBP) offers $2,400–$6,200 for battery storage. We manage all rebate paperwork as part of our service at no additional cost to you.
Gold Coast homes connect to the Energex distribution network. Energex has a straightforward solar connection process, and most standard residential systems up to 10kW single-phase are approved without issue. Larger systems may require an export limit or a network application. We handle all Energex grid connection paperwork on your behalf.
A properly sized battery can reduce grid draw during evening peak periods to under 5% of your total usage. Battery storage paired with time-of-use tariff awareness means you charge during solar production and discharge during expensive peak periods — cutting the most costly portion of your bill.

Ready to Find Out What Your Gold Coast Bill Becomes?

Book a free energy audit and we'll model your exact savings from your actual Energex bills — no obligation, no pressure. Most Gold Coast installations are running within 14 days of the first call.

Book Your Free Energy Audit